Enquire →
← RegisterFlagship · Sheet 12 · PPP · LSGD Kerala

Kalpetta Bus TerminalComplex.

Kalpetta, Wayanad · 2011

Kalpetta Bus Terminal Complex from above: green roofs, the bus yard and the Wayanad hills behind
Location
Kalpetta, Wayanad
Years
2011
Sector
PPP · LSGD Kerala
CEC role
Concessionaire
Concession from
Department of Urban Affairs, Govt. of Kerala
Project lead
Mr. Abdul Gafoor Patla, Managing Director
Scale
Bus terminal and commercial complex
Value
₹25 Cr
Status
Completed
Project note

A bus terminal and commercial complex in Kalpetta, Wayanad, and the flagship of CEC’s work. CEC developed it as concessionaire on a build-operate-transfer basis with the Department of Urban Affairs, Government of Kerala, with Mr. Abdul Gafoor Patla as Managing Director of the project.

The complex brings covered bus bays together with commercial blocks and shops. CEC’s own office is on the second floor of Commercial Complex B.

From drawing to building

How it was built.

Build sequence · 5 stages
  1. 01DesignThe whole site, drawn
  2. 02FrameThe concrete frame rises
  3. 03StructureFloors and walls go in
  4. 04CompleteTerminal and commercial blocks
  5. 05In serviceBuses in, every day
Design render of the Kalpetta Bus Terminal Complex site
01 · Design · The whole site, drawn
The bare concrete frame of a commercial block during construction
02 · Frame · The concrete frame rises
A commercial block under construction, with floors cast and infill walls going in
03 · Structure · Floors and walls go in
The finished commercial block with shops, beside the bus bays
04 · Complete · Terminal and commercial blocks
Buses parked in the terminal yard with the Wayanad hills behind
05 · In service · Buses in, every day
Enquiries

Tell us aboutthe site.